Skip to main content
Loading…
This section is included in your selections.

The permittee shall provide for the flow of all watercourses, sewers or drains intercepted during the excavation work and shall replace the same in as good condition as it found them or shall make such provisions for them as the public works director may direct. The permittee shall not obstruct the gutter of any street but shall use all proper measures to provide for the free passage of surface water. The permittee shall make provisions to take care of all surplus water, muck, silt, slicking, or other runoff pumped from excavations or resulting from sluicing or other operations and shall be responsible for any damage resulting from its failure to so provide. (Ord. 530 § 2, 2018)