Skip to main content
Loading…
This section is included in your selections.

(1) All connections shall meet with the current City of Electric City Community Street and Utility Standards as adopted by the city.

(2) When no branch is available within a reasonable distance, the main sewer shall be tapped and a hub shall be cemented into a hole cut into the main sewer pipe, which hub shall not extend or protrude past the inside wall of said pipe. The sewer shall not be tapped below the center line of the pipe and all such taps shall be inspected and approved by the sewer inspector. (Ord. 524 § 1, 2017)