16.20.820 Amendments to permits.
This section is included in your selections.
(1) A permit revision is required whenever the applicant proposes substantive changes to the design, terms or conditions of a project from that which is approved in the permit. Changes are substantive if they materially alter the project in a manner that relates to its conformance to the terms and conditions of the permit, the SMP and/or the policies and provisions of Chapter 90.58 RCW. Changes which are not substantive in effect do not require approval of a revision.
(2) Revisions to permits shall be considered consistent with WAC 173-27-100. (Ord. 484 § 2, 2014)