Skip to main content
- Description
- Amends Ch. 13.05, water
- Disposition
-
Codified
- Adoption Date
- 8/13/2019
- Effective From
- 11/1/2019
- Affecting
-
13.05.010, Application for service
(Amended by § 1)
-
13.05.020, Connection mandatory
(Amended by § 1)
-
13.05.030, Service meters required
(Amended by § 1)
-
13.05.040, Meters – Installation request
(Amended by § 1)
-
13.05.050, Meters – Control
(Amended by § 1)
-
13.05.060, Meters – Installation – Cost
(Amended by § 1)
-
13.05.070, Meters – Size, design, testing and accessibility
(Amended by § 1)
-
13.05.080, Meters – Removal – Liability
(Amended by § 1)
-
13.05.090, Right of entry
(Amended by § 1)
-
13.05.100, Separate connections with city main required – Exceptions
(Amended by § 1)
-
13.05.110, Water pipe materials and inspection requirements
(Amended by § 1)
-
13.05.115, Ownership
(Added by § 1)
-
13.05.120, Water pipe extension – Application – Charges
(Amended by § 1)
-
13.05.130, Unlawful furnishing of water – Penalty
(Amended by § 1)
-
13.05.140, Rates for water, meters, etc
(Amended by § 1)
-
13.05.150, Delinquent charges
(Amended by § 1)
-
13.05.160, Water cut off – City free of liability
(Amended by § 1)
-
13.05.170, Excessive water usage – Penalty
(Amended by § 1)
-
13.05.180, Unlawful acts
(Amended by § 1)
-
13.05.190, Rates and charges – Meter reading – Office hours
(Amended by § 1)
-
13.05.200, Property owner responsible for all charges
(Amended by § 1)
-
13.05.210, Dispute resolution
(Amended by § 1)